Established 2001 · Ajman, UAE

A workshop in Jurf, and the buildings it holds up.

Twenty-four years of structural steel in the UAE — most of it covered by a ceiling, a finish or a floor by the time anyone moves in.

001Company

The company

Al Amiri Contracting LLC was licensed in Ajman in 2001 as a steel fabrication workshop serving local contractors. It still is one. What has changed is the size of the packages and the depth of the engineering behind them.

The first operable wall support contract came in 2007, for a hotel ballroom in Sharjah. It required a beam that could carry a moving partition across twelve metres without deflecting enough to bind the track — a problem more precise than most steel a fit-out contractor handles. We solved it, then solved it again for the next ballroom, and the specialism grew from there.

Today the Jurf facility runs covered fabrication bays with overhead lifting, an in-house drawing office, and installation crews working across all seven emirates. Roughly half of each year's work comes from clients who have used us before.

Steel mezzanine structure inside the Jurf facility
002Mission and values

What we are trying to do

Be the contractor an engineer is relieved to see on the sub-contract list — because the steel is right, the record exists, and the difficult conversation already happened at drawing stage.

01

Say the difficult thing early

A problem raised at drawing stage costs a phone call. The same problem raised on site costs a programme.

02

Build it twice — once in the shop

Complex assemblies are trial-fitted before delivery, so the crane is booked against a proven fit.

03

Leave a record

Certificates, weld procedures, survey readings and as-builts are part of the deliverable, not an afterthought.

04

The steel should disappear

Most of our work is covered by a ceiling or a finish. Doing it well means nobody thinks about it again.

003Timeline

Twenty-four years, six turning points.

2001

Licensed in Ajman

Al Amiri Contracting LLC is registered in Jurf Industrial Area 1 as a steel fabrication workshop serving local contractors.

2007

First operable wall package

A hotel ballroom in Sharjah becomes the first moving-wall support contract — and the beginning of the specialism the company is now known for.

2012

Fabrication capacity doubled

The Jurf facility is extended, adding covered fabrication bays and overhead lifting for heavier sections.

2016

In-house engineering

Drawing office established so shop drawings, connection design and load checks no longer leave the building.

2020

Documented quality system

Material traceability, welder qualification and inspection records formalised across every package.

2024

Seven emirates

Installation crews working across the UAE, with more than half of annual work coming from repeat clients.

004Manufacturing excellence

Manufacturing and quality

Every package leaves with a record of how it was made. That is what makes sign-off quick at the other end.

  • Trade licence Ajman DED, contracting and steel fabrication
  • Welding Procedures qualified, welders certified and records held per project
  • Material traceability Mill certificates retained and issued with every package
  • Coating Dry film thickness recorded against the specified system
  • Safety Project-specific method statements and risk assessments
  • Documentation As-built mark-ups and O&M files issued at hand-over
Inspecting a fabricated assembly before dispatch
Steel column and beam connection on a completed frame
Quality control record being signed off in the workshop
0+Projects delivered
0Years in operation
0+Repeat clients
0Emirates covered
0tSteel fabricated
0%On-time hand-over
Start a conversation

Send the drawing. We will tell you what it takes to build.

Drawings, a sketch or a photograph of the space — whatever you have. You will get a considered answer from someone who has built it before, usually within one working day.